FOOTHILLS HOUSE

FINISHING APARTMENTS STANDARD
ZAMOYSKIEGO 44

Technology, materials, equipment and installation

- Technology and construction: traditional mixed reinforced concrete and masonry.
- Substruction: is the substructure of base plates with 30 and 50 cm thickness.
- Basement substruction walls: monolithic reinforced concrete external walls. Substruction walls insulated with a layer of extruded polystyrene.
- External walls: hollow Porotherm ceramic brick with a thickness of 30 cm + 15 cm mineral wool.
- Facing layer: fiber-cement facade panel colored in bulk with layer of matt finish Cembrit Cembonite Granite 967, pre-patinated titanium-zinc sheet Rheinzink Patina Line prePatina blaugrau (blue-gray).
- Internal bearing walls: hollow ceramic 30 cm thick Porotherm brick and partly reinforced concrete monolithic walls.
- Beams: reinforced concrete cast on wet.
- Internal lintels in partition walls: made below the ceiling level, prefabricated in the form of L-type beams or in a masonry construction.
- interfloor ceilings: wet reinforced concrete slab.
- Columns and beams: reinforced concrete.
- Main stairs: reinforced concrete.
- Terrace stairs: reinforced concrete.
- Roof: 40 degrees slope angle, wooden construction.
- Flat roof: technology of inverted and flat green roofs .
- Roof drains (with safety separator): double-walled and heated.

- External window and doors joinery: aluminum. Joinery RAL color similar to zinc-titanium sheet.
- Shutters: in aluminum construction, covered with fiber-cement board Cembrit Cembonit Granite 967.
- Lining (bands around the windows): the supporting substructure coated with tin-zinc, titanium-coated pre-treated Rheinzink prePatina blaugrau (blue-gray).
- Garage doors (with remote control): the insulated thermally sectional doors produced by Normstahl.
- Internal plaster: cement-lime plaster, smoothed with gypsum plasterboard, gypsum cardboard.
- Floors: wooden and stone, in the underground multi-station garage, industrial floor made by Bautech.
- Draining pipes: Rheinzink systems closed in facade layers.
- Gutters: Rheinzink system, hidden.
- Railings: without dividing, all-glass, self-supporting balustrades made of glass panes, unleashed in the AE KOREMBA system.
- Linear drainage system: Aco Self.
- Hydroinsulation: horizontal, vertical, made of two layers of bitumen elastomer thermo-welded on polyester warp KVE 45K from the offer of Unitrend company.
- Thermal insulation : using self-extinguishing polystyrene, as well as plates SL Roofmate, Floormate, Styrofoam IB, relatively Styrodur 3035 CS, Sturodur 2500 C at the proposal of the company Unitrend.
- Internal Combustion Wire: above the roofline, the duct with a stainless steel jacket HMS-KF according to the development of the sanitary industry.
- The plot fence (above the retaining wall): palisade fence prod. PHU Renovia Karol Górecki, made of galvanized steel profiles, height 1500mm, assembly according to system assumptions.
- Eco-friendly central heating and hot water system.
- A multi-station garage on two underground levels.
- The garage is entered by a ramp, from the street level. One-lane ramp equipped with traffic control signal system.
- Water and sewage installation - cold water supplied from the municipal water supply system.
- Installation of storm water drainage
- The heating system boiler works for the whole building, panel and duct heaters are designed in rooms.
- Electrical installation.
- Mechanical ventilation - hybrid mechanical ventilation (residential premises and commercial premises) as well as supply and exhaust ventilation in the underground car park are planned in the building.